ARREST SHOWCAUSE NOTICE PENALTY RERA EXECUTION

ARREST SHOWCAUSE NOTICE PENALTY IN RERA EXECUTIONS

Post covers Arrest Showcause Notice Penalty In Rera Executions. Can builder be arrested under RERA via showcause Notice or Section 63 Penalty is discussed in detailed. According to Section 63 of the Real Estate (Regulation and Development) Act, 2016, the promoter of a project is liable to pay a penalty of up to 5% of … Read more

Express Project Pvt. Ltd RERA Panchkula Complaint

Express Project Pvt. Ltd RERA Panchkula Complaint

This post covers Express Project Pvt. Ltd RERA Panchkula Complaint wherein the main contention was maintenance charges being levied arbitrarily extra. INTRODUCTION   In 2016 , Real Estate (Regional and Development) Act was introduced by the government of India with the aim to regulate the real estate industry and bring transparency and accountability that would protect … Read more

Opera Infratech Punjab RERA Complaint Case

THIS POST COVERS PUNJAB RERA COMPLAINT AGAINST Opera infratech

THIS POST COVERS PUNJAB RERA COMPLAINT AGAINST Opera infratech The present post will cover and give an overview of the case and it will give you a brief yet precise outline regarding all the major facts and issues involved in this particular case which basically revolves around claiming, transferring and releasing of the property as … Read more

RERA Appellate Tribunal Himachal Pradesh at Chandigarh

RERA Appellate Tribunal Himachal Pradesh at Chandigarh

This post covers RERA Appellate Tribunal Himachal Pradesh at Chandigarh where appeals from Real Estate Regulatory Authority (HPRERA) Shimla are being heard. The new website link of Himachal Pradesh RERA Authority is this one- https://hprera.nic.in/ The old one is just here for reference- http://www.hprera.in/WebSite/Home Therefore, under Section 43(4) of Real Estate (Regulation & Development) Act, … Read more

RERA CHANDIGARH AUTHORITY LAWYER ADVOCATE LEGAL ADVISOR

RERA CHANDIGARH AUTHORITY LAWYER ADVOCATE LEGAL ADVISOR

Chandigarh UT do have RERA Authority like RERA Punjab Authority and Haryana RERA Panchkula Authority but not that active since there is dearth of Real Estate Projects in Chandigarh. This can be made from the fact that the under the list of projects it shows figure zero. So certainly there is not much use of … Read more

RERA Property Advisor Chandigarh Panchkula Mohali Kharar Zirakpur

RERA Property Advisor Chandigarh Panchkula Mohali Kharar Zirakpur

Thinking of buying a property in Tricity, then talking to RERA Expert property advisor is a must. They can guide you well to understand the intricacies of a project when you are investing your hard earned money. Thinks to Consider- 1 Approvals- Valid License Number, upto date approvals from all authorities. Be it Municipal Body, … Read more

ATS Golf Meadows Lifestyle RERA Punjab Complaint

ATS Gold Meadows Lifestyle RERA Punjab Complaint

Post covers interest for delay in possession in ATS Golf Meadows Lifestyle RERA Punjab Complaint. To pay outstanding amount. Complaint Against ATS Estate Private Limited and Geenu Pawa This post is a summary of judgment wherein the complainant applied for one apartment in ATS Golf Meadows Lifestyle situated at village Madhopur, Tehsil Dera Bassi, District Mohali. … Read more

RERA Punjab Recovery as Arrears of Land Revenue

RERA Execution Recovery

Now that you have got order from RERA Punjab Authority but still clueless what to do next. Then this post will guide you what follows after you have won the case from Punjab Real Estate Regulatory Authority be it refund, interest or compensation. I know it is complex and time consuming but that’s a part … Read more

RERA Punjab Haryana Property Advice Lawyer

RERA Punjab Haryana Property Advice Zirakpur Kharar Derabassi

This post is a must for all those interested to buy property/flat/plot in Zirakpur Kharar Derabsssi or we can say District SAS Nagar (Mohali) in general. RERA Punjab Haryana Property Advice Zirakpur Kharar Derabassi for all residents who have questions related to the project from legal angle. RERA Punjab Haryana Property Lawyers will assist you … Read more

RERA Case After Delivery of Possession Before Authority

RERA Case After Delivery of Possession Before Authority

Post covers RERA Case After Delivery of Possession wherein complainant alleges builder has done acts in violation of Section 14. Also case pending before High Court Chandigarh. The case was dismissed since the complainant failed to led evidence that showed deficiencies on part of builder. The complaint was filed before the regulatory authority by the … Read more

RERA Complaint Tristar Infrastructures for Refund

RERA Complaint Tristar Infrastructures for Refund

RERA Punjab Tribunal awarded compensation in non-rera registered property for delay in possession against Tristar Infrastructures plus refund. Judgement Digest: Gurdeep Singh v. Tristar Infrastructures Case Briefing: Complainant Gurdeep Singh booked 2BHK floor and vide flat buyer agreement dated 09.02.2013 Unit no. 33GF. The unit was allotted to complainant in the project Tunis Premium Homes … Read more

CHANDIGARH OVERSEAS PVT LTD RERA Complaint

CHANDIGARH OVERSEAS PVT LTD RERA Complaint

CHANDIGARH OVERSEAS PVT LTD RERA Complaint wherein refund of payment allowed with interest SBI MCLR +2%.

JUDGEMENT SUMMARY of Complaint before RERA Punjab Authority against CHANDIGARH OVERSEAS PVT LTD RERA Complaint

HARISH MINOCHA V. CHANDIGARH OVERSEAS PVT. LTD., 7th July, 2020

Today we are going to talk about the case of Harish Minocha v. Chandigarh overseas Pvt. Ltd., 7th July, 2020. The advocate for the complainant side was Ms. Banni Chibbar and for the respondent side was ex- parte.

Read more

Shivalik Infrastructure and Developers Pvt. Ltd. Consumer Complaint

Shivalik Infrastructure and Developers Pvt. Ltd. Consumer Complaint

Post Covers Consumer Complaint Shivalik Infrastructure and Developers Pvt. Ltd. wherein possession not delivered within 1 year. Refund granted by court plus compensation. The excerpts taken from Case Title- Kiran Singh vs Shivalik Infrastructure and Developers Private Ltd. In CC/395/2017 decided on 16.3.2018. Introduction- Version of Complainant Complainant has filed this complaint against the opposite … Read more

RERA Panchkula Case against Omaxe Pvt Ltd

RERA Panchkula Case against Omaxe Pvt Ltd

RERA Panchkula Case against Omaxe Pvt Ltd wherein interest with compensation awarded for Delay. Let us have the case here titled as: MADAN LAL MUTNEJA V. M/s OMAXE PVT. LTD., 28th April, 2021 Omaxe Pvt Ltd Haryana RERA Panchkula Case Today we are going to talk about the case of Madan Lal Mutneja v. M/s … Read more

Suncity Builders Pvt Ltd Haryana RERA Complaint

Suncity Builders Pvt Ltd Haryana RERA Complaint

Suncity Builders Pvt Ltd Consumer Complaint wherein refund of amount was allowed for delay in possession. SUBHASH MALIK v. SUNCITY BUILDERS Pvt. LTD.  A complaint was filed by the complainant, Subhash Malik, against the respondent, Suncity Buildcon Pvt. Ltd., to refund the amount paid by the complainant as the respondent had failed to make the … Read more

Future City Developers Punjab RERA Complaint

Future City Developers Punjab RERA Complaint

Future City Developers Punjab RERA Complaint wherein mutual settlement was arrived with complainants for removing deficiencies. JUDGEMENT SUMMARY SAURABH KHANNA V. M/S FUTURE CITY DEVELOPERS PVT. LTD, 26th June, 2020 Today we are going to talk about the case of Saurabh Khanna v. Future City Developers Pvt . ltd, 26th June, 2020. The advocates for … Read more

Trinity Multi State Co-operative Credit Society Consumer Complaint

Trinity Multi State Co-operative Credit Society Consumer Complaint

This post is about Trinity Multi State Co-operative Credit Society Consumer Complaint where it failed to provide maturity amount. Unfair Trade Practices ( Daljeet Kumar Bansal v. Trinity Multi State Co-operative Credit Society) Through this analysis, the author will try to understand the Section 12 of the consumer protection Act. This analysis will provide an … Read more

CONSUMER COMPLAINT KIM INFRASTRUCTURE & DEVELOPERS LTD

CONSUMER COMPLAINT AGAINST KIM INFRASTRUCTURE AND DEVELOPERS LTD

Kim Infrastructure and Developers ltd. Consumer Complaint for unfair trade practice and deficiency in services. This post is a summary of judgment wherein the complainants stated that there is a deficiency and unfair trade practice on the part of the opposite parties, firstly by collecting investments from complainants without any approval of the scheme/plan from the … Read more

Nitishree Infrastructure Consumer Complaint for Delay

Nitishree Infrastructure Consumer Complaint for Delay

Nitishree Infrastructure Consumer Complaint for Delay wherein builder failed to deliver possession within stipulated time. CASE SUMMARY: In this case the Learned counsel for the complainants has vehemently contended that the complainants were allotted flat No. E-3/404, measuring 1565 sq. ft. for basic price of Rs.21,91,000/- and Flat Buyer’s Agreement Ex.C-3 was executed between the … Read more

RERA Punjab Complaint Primary Estates & Developers Pvt Ltd

RERA Punjab Complaint Primary Estates & Developers Pvt Ltd

The post talks about Primary Estates & Developers Pvt Ltd wherein builder failed to oblige mandate of Section 18 of RERA. Thus held liable to pay interest compensation for contravention. RELIEF CLAIMED U/S18 RERA, 2016 Also Read- CONSUMER COMPLAINT AGAINST PRIMARY ESTATES AND DEVELOPERS Judgement Digest:  Sat Prakash Chauhan vs. M/s Primary Estates & Developers … Read more

SBP SHINESTAR Pvt. Ltd Consumer RERA Complaint

SBP SHINESTAR Pvt. Ltd Consumer RERA Complaint

This post covers SBP SHINESTAR Pvt. LTD Consumer Complaint judgment wherein the complaint got dismissed by the commission on ground of maintainability as complainant has filed complaints before other fora’s as well. In consumer law two parallel remedies cannot be availed for the same issue. NEERAJ SARMAI v. SBP SHINESTAR Pvt. LTD COMPLAINANT: Neeraj Sarmai … Read more

Ms Universal Infrastructures Consumer Complaint for Deficiencies

Ms Universal Infrastructures Consumer Complaint for Deficiencies

In this post we will discuss about Consumer Complaint against M/s Universal Infrastructures wherein the court ordered  to obtain Completion Certificate and Occupancy Certificate in respect of the flat/project in question, to comply with the provisions of Section 17(2) of the Punjab Apartment Ownership Act, 1995 and provide registered maintenance society to the complainants within … Read more

Country Colonisers Pvt Ltd Consumer Refund Case

Country Colonisers Pvt Ltd Consumer Refund Case

In this post we will discuss about Consumer Complaint against M/S Country Colonisers Pvt. Ltd by the complainant under Section 17 of the Consumer Protection Act 1986.  Where consumer had booked a flat in their said project by paying all the amount. And in return the Respondent No.1  promised to deliver the possession within 30 months … Read more

CONSUMER COMPLAINT AGAINST BARNALA BUILDERS & PROPERTY CONSULTANTS

CONSUMER COMPLAINT AGAINST BARNALA BUILDERS & PROPERTY CONSULTANTS

In this post we will discuss about consumer Complaint against Barnala Builders & Property Consultants wherein the court held that Special limitation periods have been prescribed under Consumer Protection Act, 1986, its Rules 1987 and its Regulations 2005 for speedy disposal of consumer disputes and it is seen that the complainant has not displayed reasonable diligence … Read more

Consumer RERA Complaint Maya Garden City (Barnala Builders)

Consumer RERA Complaint Maya Garden City (Barnala Builders)

In this post we will discuss about Consumer Complaint against Maya Garden City wherein the court ordered to deliver the possession of flat on payment of any balance payment if due according to the buyer’s agreement, pay penalty @ Rs. 5/- per sq. ft. of the super area from 16.6.2017 per month till the delivery … Read more

Tulip Infratech Pvt. Ltd Haryana RERA Complaint Case

Tulip Infratech Pvt. Ltd Haryana RERA Complaint Case

In this post we will discuss about M/S Tulip Infratech Pvt. Ltd HRERA case wherein The Authority while perusing the relevant records observed as per clause 6(a) of the Buyer Builder Agreement executed between the parties, complainant-developer has the remedy to cancel the allotment of respondent-allotee after deducting earnest money. Complaint to seek direction against … Read more

Geetu Construction Pvt. Ltd. Consumer Complaint

Geetu Construction Pvt. Ltd. Consumer Complaint

In this post we will discuss about Consumer Complaint against M/S Geetu Construction Pvt. Ltd wherein the court ordered to refund ₹23,40,000/- to the complainants, along with interest at the rate of 12% per annum, to pay ₹2,00,000/-, as compensation for causing mental agony and harassment to the complainants and  to pay₹20,000/-, as litigation expenses. … Read more

HSVP HUDA RERA Panchkula Consumer Complaint

HSVP HUDA RERA Panchkula Consumer Complaint

In this post we will discuss about Consumer Complaint against Haryana Shahari Vikas Pradhikaran Huda wherein the court directed the respondent to pay compensation to the complainant equivalent to the amount of interest payable on the amount of sale consideration i.e. Rs. 1,02,50,000/- from 29.04.2015 to 21.06.2018 at the rate prescribed in Rule 15 of … Read more

Dream Century Housing Consumer Complaint RERA Punjab

Dream Century Housing Consumer Complaint RERA Punjab

In this post we will discuss about Consumer Complaint against Dream Century Housing wherein consumer purchased a unit and the opposite party failed to deliver possession of the unit within the Stipulated Period. Then homebuyer is likely to apply for completion certificate within 6 months and thereafter shall be offering possession of the said unit. … Read more

Parsvnath Developers Panchkula RERA Complaint Haryana

Parsvnath Developers Panchkula RERA Complaint Haryana

In this post we will discuss about HRERA complaint against Parsvnath Developers wherein the complaints werw allowed and the respondents were  directed to allot and deliver the possession of booked plots to the complainants in the project Parsvnath City, Sonipat on payment of balance sale consideration recoverable from them. RERA Panchkula Complaint against Parsvnath. The … Read more

RKM Housing Ltd Consumer Complaint RERA Punjab

RKM Housing Ltd Consumer Complaint RERA Punjab

In this post we will discuss about Punjab RERA complaint against RKM Housing Ltd. wherein PRERA after considering all the facts of the matter held that the complainant has undeniably a statutory right for obtaining interest for every month of delay from the respondent at the rate prescribed in Rule-15 of the RERA Rules, 2017. … Read more

Consumer RERA Complaint against Emaar Mgf Land Limited

Consumer RERA Complaint against Emaar Mgf Land Limited

In this post we will discuss about Consumer Complaint against Emaar Mgf Land Limited wherein the court ordered to deliver possession of the allotted corner plot along with all the promised facilities as per the FDI guidelines and ‘Completion Certificate’ and to pay the penalty at the rate of ₹50/- per square yard per month … Read more

Motia Developers Pvt Ltd Consumer RERA Complaint

Motia Developers Pvt Ltd Consumer RERA Complaint

In this post we will discuss about a Consumer Complaint against Motia Developers Pvt Ltd. wherein it was held that the Commission had no pecuniary jurisdiction as the value of goods i.e. flat was Rs.75,20,290/- and adding all the claimed amounts in prayer, it exceeded One Crore which comes under Pecuniary jurisdiction of National Commission. … Read more

Gillco Developers and Builders Pvt Ltd Consumer RERA Case

Gillco Developers and Builders Pvt Ltd Consumer RERA Case

In this post we will discuss about a Consumer case for refund against Gillco Developers and Builders wherein The concerned regulatory authority keeping the right and wrong of legal suit passed the order in favour of complaint .The respondent was unable to put forward any evidence ,fact ,in support  of delay in possession ,working of … Read more

Primary Estates & Developers Consumer RERA Complaint

Primary Estates & Developers Consumer RERA Complaint

In this post we will discuss about Consumer complaint against Primary Estates & Developers wherein the opposition party were held liable and was directed to refund the amount of Rs.37,51,000/- to the complainant, alongwith interest @12% p.a. (simple) from the respective dates of deposit onwards, within a period of 30 days, from the date of receipt of … Read more

Manohar Infrastructure & Constructions RERA Punjab Complaint

Manohar Infrastructure & Constructions RERA Punjab Complaint

In this post we will discuss about RERA complaint against Manohar Infrastructure & Constructions wherein The authority held that the complainant is entitled to receive delayed compensation from the promoter which shall continue to be in her favor till the date of grant of an occupational certificate from the concerned department. The respondent shall hand … Read more

Refund of Pre Deposit amount for RERA Appeal Haryana

Refund of Pre Deposit amount for RERA Appeal Haryana

In this post we will discuss about the detailed procedure for getting back the mandatory deposit amount required for filing an appeal in HREAT. How to get refund of the amount deposited by the Appellant with the Haryana Real Estate Appellate Tribunal As per Section-43(5) of the Real Estate (Regulation & Development) Act, 2016, any … Read more

Execution Case Haryana RERA Panchkula Authority Against Omaxe

Execution Case Haryana RERA Panchkula Authority Against Omaxe

Complaint for Execution of RERA orders against Omaxe Pvt.Ltd Summary-In this post we will discuss about a complaint that has been filed by the complainant seeking execution of order dated 05.03.2019 passed by HARYANA REAL ESTATE REGULATORY AUTHORITY PANCHKULA COMPLAINT FOR THE EXECUTION OF THE ORDER passed by the HARYANA REAL ESTATE REGULATORY AUTHORITY PANCHKULA … Read more

ASSURED RETURN CONSUMER RERA CASE CHANDIGARH PANCHKULA MOHALI

ASSURED RETURN CONSUMER CASE CHANDIGARH PANCHKULA MOHALI

In this post we will discuss about the legality of Assured return plans/Assured return schemes in various court of laws in India. Assured return scheme/Assured return plan is the most popular bait that comes before homebuyers given by developers to lure into the property purchase but only a few can continue this till end and … Read more

RERA Punjab Complaint against Land Twister Homes Kharar

RERA Punjab Complaint against Land Twister Homes Kharar

DELAY IN PAYMENT TO BUILDER RERA CASE. Summary- In this post we will discuss about rights and duties of allottees and the procedure to file a case when there is a dispute for the breach of contract between the both the parties. Deciding Member and Authority Sanjeev Gupta… Member GCNo.10722018 PBRERA-SAS80-PR0277 Date of Decision: 01.04.2019 … Read more

Consumer Complaint against Jagran Developer

Consumer Complaint against Jagran Developers

In this post we will discuss about mutual settlement between parties and memorandum of settlement. Smt. Suman v. M/s Jagran Developer and Anr Complainant Smt. Suman Respondent M/s Jagran Developer In the present case, the complaint was disposed of, in the first hearing itself, through a final order from the concerned authority.  The learned Counsel … Read more

Agreement to Sell RERA Punjab Haryana Panchkula

Agreement to Sell RERA Punjab Haryana Panchkula

In this post we will discuss about Agreement to Sell under The RERA Act, 2016 and various compliances related to this agreement. Whether Agreement to Sell is to be registered as under RERA? Any contract for sale of an immovable property that provides that the sale takes place on terms that is settled between both … Read more

Ultratech Developers Haryana RERA Panchklula Authority Complaint

Ultratech Developers Haryana RERA Panchklula Authority Complaint

Builder not liable for compensation if delay is by Government Department. In this post we will discuss about the case of Ultratech developers wherein the buyer was granted interest for the period of delay but no compensation was awarded because the respondent was not responsible for delay. Rajat Chawla v. M/s Ultratech Township Developers Pvt. … Read more

Limitation in Filing Appeal RERA Punjab Appellate Tribunal

Limitation in Filing Appeal RERA Punjab Appellate Tribunal

Bureaucratic delays not an excuse for filing appeals beyond the period of limitation. In this post we will discuss about the law of limitation and whether government bodies can file a case beyond this period of limitation on the grounds of bureaucratic delay. Real Estate (Regulation and Development) Act (RERA) is an act passed by … Read more

Pre Deposit Before RERA Appeal Punjab Haryana Authority

Pre Deposit Before RERA Appeal Punjab Haryana Authority

This report looks into a judgment of Punjab and Haryana High Court in the matter of a statutory provision contained in the Real Estate (Regulation and Development) Act 2016. The appellant wished that the deposit as stipulated by the provision should be waived off in light of the unique circumstances of his case. However, appeals … Read more

Punjab RERA Complaint against Sushma Buildtech Ltd Homework

Punjab RERA Complaint against Sushma Buildtech Ltd Homework

In this post we will discuss about the quasi-retroactive application of the RERA ACT, 2016 and whether it is applicable when the transactions are still in the process even though the sale agreements had been executed before the Act came into force. Judgment Digest: Anjana Goyal and Another vs Sushma Buildtech Ltd. This recent judgment … Read more

Agreement to Sell Registration under RERA

Agreement to Sell Registration under RERA

Whether or not the agreement to sell should be registered or not answers this post. Though the RERA Act mentions the registration of agreement to sell but still there is void in Registration & Stamp Act which doesn’t spell out agreement to sell should be registered or not? So unless the central act is amended … Read more

Sandwoods Infratech Projects RERA Punjab Complaint

This is a post of Sandwoods Infratech Projects RERA Punjab Complaint wherein the refund was allowed by the Adjudicating officer with interest as per rate stipulated in RERA Punjab Rules. Judgment Digest: Kanisth Ganeriwala and Another vs Sandwoods Infratech Projects Pvt. Ltd. & Parika Ganeriwala and Another vs Sandwoods Infratech Projects Pvt. Ltd. In this … Read more

Haryana RERA Panchkula Complaint against Samar Estates

Haryana RERA Panchkula Complaint against Samar Estates

This post is a case digest on Haryana RERA Panchkula Complaint against Samar Estates wherein the project was standstill and no longer near completion. Keeping in the interest of allottees the Haryana RERA Panchkula Authority order State Government and Town Country Planning and Department to see feasibility if they can take over the project and … Read more

RERA Punjab Complaint against ATS Estate Private Ltd

RERA Punjab Complaint against ATS Estate Private Ltd

This post covers RERA Punjab Complaint against ATS Estate Private Ltd before Adjudicating Officer wherein the refund of entire amount was allowed along with interest & further compensation for delay in possession on account of mental agony, pain and harassment. RERA Punjab Authorities are strict for builder for defying possessions timeline where customer suffers for … Read more